Change Order (Lump Sum) - 496
ConsensusDocs 496 is a change order form designed for use with the ConsensusDocs 415 agreement. It formalizes mutually agreed-upon modifications to the contract schedule, price, or scope of work.
Included in:
Full Package, Design/Builder Package

ConsensusDocs 496 is a standardized change order form developed specifically for use with the ConsensusDocs 415 design-build agreement. It provides a clear and consistent method for formalizing changes in the project schedule, contract price, or scope of work, ensuring that both the Design-Builder and Owner are in mutual agreement before adjustments are implemented.
In the design-build construction process, unforeseen conditions and evolving project needs frequently necessitate changes. Whether due to design modifications, inaccurate work estimates, weather-related delays, material availability issues, or owner-requested enhancements, these adjustments must be handled with precision and transparency. ConsensusDocs 496 enables teams to process these changes without disrupting the project flow or creating contractual uncertainty.
Key features of the ConsensusDocs 496 include:
- A structured format to document the nature of the change
- Provisions for adjusting the contract time, contract price, or both
- Required signatures from both the Owner and Design-Builder
- A section that tracks previous change orders, helping maintain comprehensive contract documentation
By using ConsensusDocs 496, stakeholders ensure that any modifications to the original agreement are clearly documented, mutually approved, and legally enforceable. This promotes project continuity, helps prevent disputes, and supports smoother project delivery.
The document is particularly important in design-build projects, where design and construction services are integrated and changes can impact multiple facets of the project. ConsensusDocs 496 helps maintain alignment between contractual obligations and real-world project execution, offering both clarity and protection for all parties involved.
Whether you are adjusting for scope expansions, cost recalculations, or schedule shifts, ConsensusDocs 496 is the trusted solution for managing change orders under a ConsensusDocs 415 design-build contract.