The ConsensusDocs 203 can be used as a unilateral order issued by the Owner of the construction project for changes needed in the work to be performed by the Constructor (aka builder, general contractor, design-builder, construction manager) when a ConsensusDocs 202 Change Order has not been agreed upon.

Included in:

Full Package, Owner Package

contract-graphic

This contract document is used when an interim directive is issued by the owner as a unilateral order to the Constructor to perform a change to the work that is not agreed upon. If agreed upon, then the ConsensusDocs 202 change order form should be used. In addition, this contract document can be used to provide field instructions or other information that does not impact price or time.

 